|
|
| Brand Name: | CHG |
| Model Number: | AC-29 |
| MOQ: | 1 set |
| Price: | 100,000-300,000 USD |
| Payment Terms: | L/C,D/A,D/P,T/T |
| Supply Ability: | 10 sets per year |
Industrial Automatic Powder Coating System with PP Spray Booth and Power and Free Conveyor
CHG provides customized automatic powder coating systems for industrial metal parts, combining electrostatic powder spraying, manual touch-up, and overhead conveyor transportation in an integrated production line.
The system is suitable for processing metal components with different dimensions and geometries. Its polypropylene (PP) spray booth accommodates automatic powder application and supplementary manual spraying, while a Power and Free conveyor transports suspended workpieces through the coating process.
Manual loading and unloading stations provide flexibility when handling products with different shapes, weights, and hanging requirements.
The production line is engineered according to the customer's workpiece specifications, required production capacity, coating standards, and available factory space.
The powder application section incorporates a PP spray booth designed for industrial electrostatic coating operations.
Polypropylene offers good resistance to many chemicals and provides a surface suitable for routine cleaning and maintenance.
The booth dimensions and internal equipment arrangement are customized according to the maximum workpiece size, spraying method, and required operating space.
Automatic electrostatic guns perform the primary powder application.
For components with complex shapes, manual spraying stations allow operators to apply additional powder to recessed areas, corners, edges, and other surfaces requiring attention.
This combination provides flexibility for manufacturers processing different types of metal products.
The Power and Free conveyor transports suspended components between the main production sections.
Its separate power and free tracks allow carriers to stop, accumulate, and resume movement at designated positions.
This helps coordinate material transportation with spraying, loading, unloading, and other production operations.
Operators load metal parts onto customized hangers and remove finished products after curing and cooling.
Manual loading and unloading are particularly useful when workpiece dimensions and hanging arrangements vary between production batches.
| Equipment | Main Function |
|---|---|
| Loading Station | Manual hanging of metal components |
| Power and Free Conveyor | Controlled workpiece transportation |
| Surface Pretreatment System | Cleaning and chemical preparation |
| Drying Oven | Removal of residual moisture |
| PP Powder Spray Booth | Enclosed powder application area |
| Automatic Electrostatic Guns | Primary powder coating application |
| Manual Spray Stations | Supplementary coating of complex surfaces |
| Powder Recovery Equipment | Collection of oversprayed powder |
| Curing Oven | Thermal curing of powder coating |
| Cooling Section | Cooling before unloading |
| Unloading Station | Manual removal of finished products |
| Electrical Control System | Coordination of production equipment |
The final configuration is determined according to the customer's products and manufacturing requirements.
A typical production sequence includes:
Manual Loading → Surface Cleaning → Chemical Pretreatment → Drying → Automatic Powder Spraying → Manual Touch-Up → Curing → Cooling → Inspection → Manual Unloading
Metal components are cleaned to remove oil, grease, dust, and other contaminants that may affect coating adhesion.
The cleaning method depends on the substrate material and initial surface condition.
Suitable cleaning is important for achieving consistent results during subsequent chemical pretreatment and powder application.
After cleaning, the workpieces undergo appropriate chemical treatment to prepare the metal surfaces for coating.
For steel components, phosphate or alternative conversion coating systems may be used.
For aluminum components, chromate or chrome-free conversion treatment may be selected according to the required coating performance.
The pretreatment process is designed according to the substrate, corrosion resistance requirements, and coating specification.
Following pretreatment and rinsing, the workpieces pass through a drying oven.
This stage removes residual water before electrostatic powder application.
Drying conditions are selected according to the workpiece dimensions, material thickness, and conveyor speed.
The prepared components enter the PP spray booth.
Automatic electrostatic guns apply charged powder particles to the grounded metal surfaces.
Gun positioning, spraying distance, and powder delivery parameters are adjusted according to the workpiece geometry and required coating thickness.
Operators provide supplementary spraying where necessary.
Manual application is particularly useful for welded joints, recessed surfaces, corners, and irregular components that may require additional coating coverage.
The amount of manual touch-up depends on the product design and automatic spraying arrangement.
After spraying, the workpieces enter the curing oven.
Controlled heating causes the powder coating to melt and flow into a continuous film.
For thermosetting powders, chemical cross-linking develops the specified coating properties.
Curing conditions are established according to the powder manufacturer's requirements, including the required metal temperature and residence time.
Following curing, the coated workpieces enter the cooling section.
Natural or forced-air cooling can be selected according to production requirements.
After cooling, finished products are inspected for coating thickness, appearance, adhesion, and other specified quality characteristics before unloading.
The Power and Free conveyor provides flexibility in workpiece movement compared with a conventional continuously driven overhead system.
Depending on the conveyor layout and control configuration, the system can support:
Independent carrier stopping
Accumulation before processing stations
Controlled carrier release
Coordination of different production operations
Flexible loading and unloading
Efficient use of overhead workshop space
The conveyor track, carrier capacity, and hanger arrangement are designed according to the actual workpiece dimensions and weight.
The spray booth can be connected to a powder recovery system to collect oversprayed material during coating operations.
Depending on the project, the recovery arrangement may incorporate cyclone separation, cartridge filtration, or other suitable collection equipment.
The system is selected according to powder characteristics, production capacity, color-change frequency, and coating quality requirements.
Recovered powder may be reused when compatible with the powder manufacturer's recommendations and the customer's specifications.
This powder coating production line can be customized for different metal products, including:
Electrical cabinets and enclosures
Metal furniture components
Machinery frames
Fabricated steel structures
Industrial storage racks
Automotive metal parts
Aluminum fabricated components
Equipment housings
Metal brackets and supports
General industrial metal products
The final equipment configuration depends on workpiece dimensions, weight, substrate material, and required coating performance.
| Parameter | Configuration |
|---|---|
| Coating Method | Automatic electrostatic spraying with manual touch-up |
| Spray Booth Material | PP (polypropylene) |
| Conveyor Type | Power and Free overhead conveyor |
| Loading | Manual |
| Unloading | Manual |
| Workpiece Material | Steel, aluminum, and other suitable conductive metals |
| Workpiece Dimensions | Customized |
| Conveyor Capacity | According to workpiece weight |
| Spray Gun Arrangement | Project-specific |
| Powder Recovery | According to production requirements |
| Pretreatment | Selected according to substrate |
| Drying | Integrated moisture drying |
| Curing | Powder curing oven |
| Cooling | Natural or forced-air |
| Control System | Customized |
| Workshop Layout | Project-specific engineering |
CHG develops each powder coating production line according to the customer's actual manufacturing requirements.
To prepare a technical proposal and quotation, please provide:
Workpiece drawings or photographs
Product material
Maximum length, width, and height
Maximum individual workpiece weight
Required hourly or daily production capacity
Number of components per hanger
Powder coating type
Required coating thickness
Number of coating colors
Color-change frequency
Pretreatment requirements
Available workshop dimensions
Factory clear height
Heating energy and electrical supply
Required automation level
Based on this information, CHG can evaluate the conveyor arrangement, PP spray booth, spraying equipment, powder recovery system, curing oven, and overall production line layout.
CHG supplies integrated powder coating production lines for manufacturers requiring flexible surface finishing and material handling equipment.
This configuration combines a PP powder spray booth, automatic electrostatic spraying, manual touch-up stations, and a Power and Free conveyor to accommodate different metal components and production requirements.
Each system is engineered according to the customer's workpiece characteristics, coating specifications, production capacity, and factory conditions.
Contact CHG with your product specifications and production requirements to receive a customized automatic powder coating line proposal and quotation.
![]()