![]() |
Brand Name: | CHG |
Model Number: | AC-30 |
MOQ: | 1 set |
Price: | Negotiable |
Payment Terms: | L/C, D/P, T/T, Western Union, MoneyGram |
Supply Ability: | 10 sets per year |
This automatic powder coating production line is suitable for metal parts of various sizes and shapes. The material of the spray booth is PP, and the spraying method combines automatic gun spraying and additional manual coating, and the production line adopts the power & free overhead system, and the parts are loaded and unloaded manually.
All of our powder coating production lines are designed according to client's products and demands. A more accurate quotation needs to be calculated according to the parameters of the coating production lines you need. Please contact us and a detailed specification for the discussion will be very much appreciated.
The Process of Powder Coating Line:
1. Surface Preparation: |
The first step in the powder coating line is the surface preparation of the aluminum profiles. This stage is essential to ensure proper adhesion of the powder coating. Surface preparation may include cleaning, degreasing, and removing any contaminants from the aluminum surfaces. |
2. Pre-Treatment: |
Following surface preparation, the aluminum profiles undergo a pre-treatment process to enhance both coating adhesion and corrosion resistance. Common methods include chemical cleaning, phosphating, or chromate conversion coating, all of which prepare the aluminum surface for optimal powder adhesion and improved coating performance. |
3. Drying: |
Once the pre-treatment is completed, the aluminum profiles are passed through drying ovens to remove any remaining moisture from the surface. Dry aluminum surfaces are crucial for proper powder coating adhesion and finish. |
4. Powder Coating Application: |
With the profiles thoroughly dried, they are ready for powder coating application. The electrostatically charged powder is sprayed onto the aluminum profiles using specialized guns. The positively charged powder particles are attracted to the grounded metal surfaces, ensuring an even and uniform coating. |
5. Powder Curing: |
After powder coating application, the aluminum profiles are transferred to curing ovens. In the curing ovens, the powder coating undergoes a thermal curing process. The oven's heat causes the powder particles to melt and flow, creating a continuous, smooth coating film. The curing process also chemically cross-links the powder particles, ensuring a durable and hardened finish. |
6. Cooling: |
Following the curing process, the coated profiles enter a cooling phase. This stabilizes the coating and ensures it retains its properties and appearance over time. |
7. Quality Inspection: |
After cooling, the coated aluminum profiles undergo a thorough quality inspection. The inspection involves checking the coating thickness, appearance, adhesion, and overall quality to ensure it meets the specified standards. |